Haztech Solutions

Ex register

Every Ex-rated item by site — protection concept, zone, certificate, last inspection and result
Demo 09 Oct 2026
TagSiteAreaEquipmentExZoneGasTLast inspectedGradeResultNext due
CS1-CG-180 Burrup LNG — Compressor Station 1 Compressor house Cable gland set Ex e Zone 1 IIC T4 29 Sep 2026 Detailed Pass In date
CS1-CS-107 Burrup LNG — Compressor Station 1 Compressor house Control station Ex de Zone 2 IIB T4 21 Sep 2026 Detailed Pass In date
CS1-CS-182 Burrup LNG — Compressor Station 1 Compressor house Control station Ex de Zone 2 IIC T4 30 Sep 2026 Detailed Pass In date
CS1-HT-170 Burrup LNG — Compressor Station 1 Compressor house Heater Ex e Zone 1 IIB T4 28 Sep 2026 Detailed Pass In date
CS1-LT-260 Burrup LNG — Compressor Station 1 Compressor house Level transmitter Ex ia Zone 2 IIA T4 — — Not inspected —
CS1-PP-151 Burrup LNG — Compressor Station 1 Compressor house Purged panel Ex p Zone 1 IIA T6 26 Sep 2026 Detailed Pass In date
CS1-PP-188 Burrup LNG — Compressor Station 1 Compressor house Purged panel Ex p Zone 2 IIA T3 30 Sep 2026 Detailed Pass In date
CS1-PT-202 Burrup LNG — Compressor Station 1 Compressor house Pressure transmitter Ex ia Zone 2 IIC T3 02 Oct 2026 Detailed Pass In date
CS1-SO-124 Burrup LNG — Compressor Station 1 Compressor house Socket outlet Ex de Zone 2 IIB T6 23 Sep 2026 Detailed Pass In date
CS1-SO-190 Burrup LNG — Compressor Station 1 Compressor house Socket outlet Ex de Zone 1 IIC T4 01 Oct 2026 Detailed Major defect In date
CS1-SV-142 Burrup LNG — Compressor Station 1 Compressor house Solenoid valve Ex ia Zone 2 IIA T3 25 Sep 2026 Detailed Pass In date
CS1-SV-200 Burrup LNG — Compressor Station 1 Compressor house Solenoid valve Ex ia Zone 1 IIB T4 02 Oct 2026 Detailed Pass In date
CS1-SV-244 Burrup LNG — Compressor Station 1 Compressor house Solenoid valve Ex ia Zone 1 IIB T6 — — Not inspected —
CS1-CG-123 Burrup LNG — Compressor Station 1 Cooling water pumps Cable gland set Ex e Zone 1 IIC T6 23 Sep 2026 Detailed Pass In date
CS1-CG-135 Burrup LNG — Compressor Station 1 Cooling water pumps Cable gland set Ex e Zone 1 IIB T3 24 Sep 2026 Detailed Minor defect In date
CS1-CS-110 Burrup LNG — Compressor Station 1 Cooling water pumps Control station Ex de Zone 2 IIB T3 22 Sep 2026 Detailed Pass In date
CS1-CS-198 Burrup LNG — Compressor Station 1 Cooling water pumps Control station Ex de Zone 2 IIA T4 01 Oct 2026 Detailed Pass In date
CS1-CS-213 Burrup LNG — Compressor Station 1 Cooling water pumps Control station Ex de Zone 1 IIC T6 — — Not inspected —
CS1-JB-256 Burrup LNG — Compressor Station 1 Cooling water pumps Junction box Ex e Zone 2 IIC T4 — — Not inspected —
CS1-LT-158 Burrup LNG — Compressor Station 1 Cooling water pumps Level transmitter Ex ia Zone 2 IIB T3 27 Sep 2026 Detailed Pass In date
CS1-LT-173 Burrup LNG — Compressor Station 1 Cooling water pumps Light fitting Ex d Zone 2 IIC T6 29 Sep 2026 Detailed Pass In date
CS1-M-117 Burrup LNG — Compressor Station 1 Cooling water pumps Motor Ex de Zone 1 IIB T4 22 Sep 2026 Detailed Pass In date
CS1-PP-102 Burrup LNG — Compressor Station 1 Cooling water pumps Purged panel Ex p Zone 1 IIA T4 21 Sep 2026 Detailed Pass In date
CS1-PP-266 Burrup LNG — Compressor Station 1 Cooling water pumps Purged panel Ex p Zone 1 IIB T4 — — Not inspected —
CS1-PT-177 Burrup LNG — Compressor Station 1 Cooling water pumps Pressure transmitter Ex ia Zone 2 IIC T4 29 Sep 2026 Detailed Pass In date
CS1-SO-224 Burrup LNG — Compressor Station 1 Cooling water pumps Socket outlet Ex de Zone 2 IIB T6 — — Not inspected —
CS1-CG-105 Burrup LNG — Compressor Station 1 Fuel gas conditioning Cable gland set Ex e Zone 1 IIC T4 21 Sep 2026 Detailed Pass In date
CS1-CS-186 Burrup LNG — Compressor Station 1 Fuel gas conditioning Control station Ex de Zone 1 IIB T3 30 Sep 2026 Detailed Pass In date
CS1-CS-235 Burrup LNG — Compressor Station 1 Fuel gas conditioning Control station Ex de Zone 1 IIB T3 — — Not inspected —
CS1-HT-234 Burrup LNG — Compressor Station 1 Fuel gas conditioning Heater Ex e Zone 1 IIA T4 — — Not inspected —
CS1-HT-255 Burrup LNG — Compressor Station 1 Fuel gas conditioning Heater Ex e Zone 1 IIB T6 — — Not inspected —
CS1-LT-119 Burrup LNG — Compressor Station 1 Fuel gas conditioning Light fitting Ex d Zone 1 IIA T3 23 Sep 2026 Detailed Pass In date
CS1-LT-155 Burrup LNG — Compressor Station 1 Fuel gas conditioning Level transmitter Ex ia Zone 1 IIB T3 27 Sep 2026 Detailed Pass In date
CS1-LT-207 Burrup LNG — Compressor Station 1 Fuel gas conditioning Light fitting Ex d Zone 1 IIC T6 — — Not inspected —
CS1-PP-136 Burrup LNG — Compressor Station 1 Fuel gas conditioning Purged panel Ex p Zone 1 IIB T4 25 Sep 2026 Detailed Pass In date
CS1-PP-163 Burrup LNG — Compressor Station 1 Fuel gas conditioning Purged panel Ex p Zone 1 IIB T6 28 Sep 2026 Detailed Pass In date
CS1-PT-242 Burrup LNG — Compressor Station 1 Fuel gas conditioning Pressure transmitter Ex ia Zone 1 IIB T6 — — Not inspected —
CS1-SO-147 Burrup LNG — Compressor Station 1 Fuel gas conditioning Socket outlet Ex de Zone 1 IIC T6 26 Sep 2026 Detailed Pass In date
CS1-SO-217 Burrup LNG — Compressor Station 1 Fuel gas conditioning Socket outlet Ex de Zone 1 IIC T3 — — Not inspected —
CS1-SV-249 Burrup LNG — Compressor Station 1 Fuel gas conditioning Solenoid valve Ex ia Zone 1 IIB T4 — — Not inspected —
CS1-CG-226 Burrup LNG — Compressor Station 1 Lube oil skid Cable gland set Ex e Zone 1 IIC T3 — — Not inspected —
CS1-CS-208 Burrup LNG — Compressor Station 1 Lube oil skid Control station Ex de Zone 2 IIC T3 — — Not inspected —
CS1-CS-238 Burrup LNG — Compressor Station 1 Lube oil skid Control station Ex de Zone 2 IIB T3 — — Not inspected —
CS1-GD-161 Burrup LNG — Compressor Station 1 Lube oil skid Gas detector Ex d Zone 1 IIA T3 27 Sep 2026 Detailed Pass In date
CS1-JB-166 Burrup LNG — Compressor Station 1 Lube oil skid Junction box Ex e Zone 1 IIB T4 28 Sep 2026 Detailed Pass In date
CS1-JB-229 Burrup LNG — Compressor Station 1 Lube oil skid Junction box Ex e Zone 2 IIB T6 — — Not inspected —
CS1-JB-252 Burrup LNG — Compressor Station 1 Lube oil skid Junction box Ex e Zone 2 IIC T3 — — Not inspected —
CS1-LT-139 Burrup LNG — Compressor Station 1 Lube oil skid Light fitting Ex d Zone 2 IIB T6 25 Sep 2026 Detailed Pass In date
CS1-LT-216 Burrup LNG — Compressor Station 1 Lube oil skid Level transmitter Ex ia Zone 2 IIB T4 — — Not inspected —
CS1-LT-222 Burrup LNG — Compressor Station 1 Lube oil skid Light fitting Ex d Zone 2 IIB T4 — — Not inspected —
CS1-LT-264 Burrup LNG — Compressor Station 1 Lube oil skid Level transmitter Ex ia Zone 1 IIC T6 — — Not inspected —
CS1-M-113 Burrup LNG — Compressor Station 1 Lube oil skid Motor Ex de Zone 1 IIA T3 22 Sep 2026 Detailed Pass In date
CS1-M-130 Burrup LNG — Compressor Station 1 Lube oil skid Motor Ex de Zone 1 IIB T6 24 Sep 2026 Detailed Pass In date
CS1-M-195 Burrup LNG — Compressor Station 1 Lube oil skid Motor Ex de Zone 2 IIB T6 01 Oct 2026 Detailed Pass In date
CS1-PT-129 Burrup LNG — Compressor Station 1 Lube oil skid Pressure transmitter Ex ia Zone 1 IIA T3 24 Sep 2026 Detailed Pass In date
CS1-PT-149 Burrup LNG — Compressor Station 1 Lube oil skid Pressure transmitter Ex ia Zone 2 IIB T6 26 Sep 2026 Detailed Pass In date
CS2-CG-102 Burrup LNG — Compressor Station 2 Compressor house Cable gland set Ex e Zone 2 IIB T6 26 Oct 2023 Detailed Pass In date
CS2-CG-115 Burrup LNG — Compressor Station 2 Compressor house Cable gland set Ex e Zone 2 IIB T4 22 Oct 2023 Detailed Pass In date
CS2-CG-137 Burrup LNG — Compressor Station 2 Compressor house Cable gland set Ex e Zone 2 IIA T4 14 Oct 2023 Detailed Pass In date
CS2-HT-120 Burrup LNG — Compressor Station 2 Compressor house Heater Ex e Zone 1 IIB T4 29 Oct 2023 Detailed Pass In date
CS2-JB-111 Burrup LNG — Compressor Station 2 Compressor house Junction box Ex e Zone 1 IIB T3 23 Oct 2023 Detailed Pass In date
CS2-LT-145 Burrup LNG — Compressor Station 2 Compressor house Level transmitter Ex ia Zone 2 IIB T3 26 Oct 2023 Detailed Pass In date
CS2-M-139 Burrup LNG — Compressor Station 2 Compressor house Motor Ex de Zone 2 IIB T4 27 Oct 2023 Detailed Pass In date
CS2-PP-144 Burrup LNG — Compressor Station 2 Compressor house Purged panel Ex p Zone 1 IIA T4 28 Oct 2023 Detailed Pass In date
CS2-PT-105 Burrup LNG — Compressor Station 2 Compressor house Pressure transmitter Ex ia Zone 1 IIB T4 29 Oct 2023 Detailed Pass In date
CS2-SO-121 Burrup LNG — Compressor Station 2 Compressor house Socket outlet Ex de Zone 2 IIB T6 21 Oct 2023 Detailed Pass In date
CS2-SV-127 Burrup LNG — Compressor Station 2 Compressor house Solenoid valve Ex ia Zone 2 IIA T3 15 Oct 2023 Detailed Pass In date
CS2-CG-112 Burrup LNG — Compressor Station 2 Scrubbers Cable gland set Ex e Zone 2 IIB T3 25 Oct 2023 Detailed Pass In date
CS2-JB-126 Burrup LNG — Compressor Station 2 Scrubbers Junction box Ex e Zone 2 IIA T4 28 Oct 2023 Detailed Pass In date
CS2-LT-135 Burrup LNG — Compressor Station 2 Scrubbers Light fitting Ex d Zone 1 IIB T4 18 Oct 2023 Detailed Pass In date
CS2-PP-130 Burrup LNG — Compressor Station 2 Scrubbers Purged panel Ex p Zone 2 IIC T3 15 Oct 2023 Detailed Pass In date
CS2-PT-150 Burrup LNG — Compressor Station 2 Scrubbers Pressure transmitter Ex ia Zone 2 IIB T6 21 Oct 2023 Detailed Pass In date
CS2-SO-151 Burrup LNG — Compressor Station 2 Scrubbers Socket outlet Ex de Zone 1 IIC T3 01 Nov 2023 Detailed Pass In date
CS2-SV-106 Burrup LNG — Compressor Station 2 Scrubbers Solenoid valve Ex ia Zone 1 IIC T4 17 Oct 2023 Detailed Pass In date
KGA-CS-131 Burrup — compressor station A Compressor bay Control station Ex de Zone 1 IIB T3 31 May 2026 Detailed Pass In date
KGA-HT-100 Burrup — compressor station A Compressor bay Heater Ex e Zone 1 IIB T4 17 May 2026 Detailed Pass In date
KGA-HT-142 Burrup — compressor station A Compressor bay Heater Ex e Zone 2 IIB T6 21 May 2026 Detailed Pass In date
KGA-JB-133 Burrup — compressor station A Compressor bay Junction box Ex e Zone 2 IIC T4 31 May 2026 Detailed Pass In date
KGA-LT-113 Burrup — compressor station A Compressor bay Light fitting Ex d Zone 2 IIB T3 24 May 2026 Detailed Pass In date
KGA-M-118 Burrup — compressor station A Compressor bay Motor Ex de Zone 2 IIB T4 30 May 2026 Detailed Pass In date
KGA-SV-106 Burrup — compressor station A Compressor bay Solenoid valve Ex ia Zone 1 IIC T4 24 May 2026 Detailed Pass In date
KGA-CG-110 Burrup — compressor station A Metering Cable gland set Ex e Zone 2 IIC T4 17 May 2026 Detailed Pass In date
KGA-LT-103 Burrup — compressor station A Metering Level transmitter Ex ia Zone 1 IIB T4 23 May 2026 Detailed Pass In date
KGA-LT-117 Burrup — compressor station A Metering Level transmitter Ex ia Zone 2 IIA T6 01 Jun 2026 Detailed Pass In date
KGA-LT-137 Burrup — compressor station A Metering Level transmitter Ex ia Zone 1 IIA T3 15 May 2026 Detailed Pass In date
KGA-LT-145 Burrup — compressor station A Metering Light fitting Ex d Zone 2 IIC T4 26 May 2026 Detailed Pass In date
KGA-M-126 Burrup — compressor station A Metering Motor Ex de Zone 2 IIA T4 29 May 2026 Detailed Pass In date
KGA-PT-121 Burrup — compressor station A Metering Pressure transmitter Ex ia Zone 2 IIA T4 17 May 2026 Detailed Pass In date
KGA-SO-129 Burrup — compressor station A Metering Socket outlet Ex de Zone 2 IIB T6 23 May 2026 Detailed Pass In date
KGA-SV-141 Burrup — compressor station A Metering Solenoid valve Ex ia Zone 1 IIB T6 16 May 2026 Detailed Pass In date
KUR-CS-132 Kurra Camp — switchroom & fuel farm Bowser island Control station Ex de Zone 1 IIC T4 — — Not inspected —
KUR-CS-160 Kurra Camp — switchroom & fuel farm Bowser island Control station Ex de Zone 1 IIB T6 — — Not inspected —
KUR-GD-147 Kurra Camp — switchroom & fuel farm Bowser island Gas detector Ex d Zone 1 IIA T3 — — Not inspected —
KUR-HT-129 Kurra Camp — switchroom & fuel farm Bowser island Heater Ex e Zone 1 IIC T4 — — Not inspected —
KUR-LT-109 Kurra Camp — switchroom & fuel farm Bowser island Light fitting Ex d Zone 1 IIC T4 18 Sep 2026 Detailed Pass In date
KUR-LT-133 Kurra Camp — switchroom & fuel farm Bowser island Light fitting Ex d Zone 1 IIA T4 — — Not inspected —
KUR-SV-126 Kurra Camp — switchroom & fuel farm Bowser island Solenoid valve Ex ia Zone 1 IIA T3 23 Sep 2026 Detailed Pass In date
KUR-CG-142 Kurra Camp — switchroom & fuel farm Fuel farm Cable gland set Ex e Zone 1 IIA T4 — — Not inspected —
KUR-CG-151 Kurra Camp — switchroom & fuel farm Fuel farm Cable gland set Ex e Zone 1 IIC T6 — — Not inspected —
KUR-CG-164 Kurra Camp — switchroom & fuel farm Fuel farm Cable gland set Ex e Zone 1 IIC T4 — — Not inspected —
KUR-HT-108 Kurra Camp — switchroom & fuel farm Fuel farm Heater Ex e Zone 1 IIC T4 17 Sep 2026 Detailed Pass In date
KUR-JB-158 Kurra Camp — switchroom & fuel farm Fuel farm Junction box Ex e Zone 1 IIC T6 — — Not inspected —
KUR-SO-102 Kurra Camp — switchroom & fuel farm Fuel farm Socket outlet Ex de Zone 1 IIC T6 15 Sep 2026 Detailed Pass In date
KUR-SO-149 Kurra Camp — switchroom & fuel farm Fuel farm Socket outlet Ex de Zone 1 IIA T4 — — Not inspected —
KUR-SV-112 Kurra Camp — switchroom & fuel farm Fuel farm Solenoid valve Ex ia Zone 1 IIA T6 19 Sep 2026 Detailed Pass In date
KUR-CG-140 Kurra Camp — switchroom & fuel farm Generator yard Cable gland set Ex e Zone 2 IIB T3 — — Not inspected —
KUR-CS-137 Kurra Camp — switchroom & fuel farm Generator yard Control station Ex de Zone 1 IIB T4 — — Not inspected —
KUR-GD-122 Kurra Camp — switchroom & fuel farm Generator yard Gas detector Ex d Zone 1 IIA T3 22 Sep 2026 Detailed Pass In date
KUR-HT-156 Kurra Camp — switchroom & fuel farm Generator yard Heater Ex e Zone 2 IIC T6 — — Not inspected —
KUR-JB-105 Kurra Camp — switchroom & fuel farm Generator yard Junction box Ex e Zone 1 IIB T4 16 Sep 2026 Detailed Pass In date
KUR-LT-120 Kurra Camp — switchroom & fuel farm Generator yard Level transmitter Ex ia Zone 2 IIC T6 21 Sep 2026 Detailed Pass In date
KUR-SV-117 Kurra Camp — switchroom & fuel farm Generator yard Solenoid valve Ex ia Zone 2 IIC T6 20 Sep 2026 Detailed Pass In date
MTH-JB-106 Mt Holland — processing plant Diesel storage Junction box Ex e Zone 1 IIC T6 14 Aug 2026 Detailed Pass In date
MTH-JB-120 Mt Holland — processing plant Diesel storage Junction box Ex e Zone 1 IIC T4 15 Sep 2026 Detailed Pass In date
MTH-LT-151 Mt Holland — processing plant Diesel storage Level transmitter Ex ia Zone 1 IIC T3 24 Aug 2026 Detailed Pass In date
MTH-M-110 Mt Holland — processing plant Diesel storage Motor Ex de Zone 1 IIA T4 31 Aug 2026 Detailed Pass In date
MTH-PP-156 Mt Holland — processing plant Diesel storage Purged panel Ex p Zone 1 IIA T6 30 Aug 2026 Detailed Pass In date
MTH-SO-123 Mt Holland — processing plant Diesel storage Socket outlet Ex de Zone 1 IIC T4 18 Sep 2026 Detailed Pass In date
MTH-SV-103 Mt Holland — processing plant Diesel storage Solenoid valve Ex ia Zone 1 IIA T4 31 Aug 2026 Detailed Pass In date
MTH-CS-114 Mt Holland — processing plant Flotation Control station Ex de Zone 2 IIB T4 12 Aug 2026 Detailed Pass In date
MTH-CS-138 Mt Holland — processing plant Flotation Control station Ex de Zone 2 IIA T6 12 Aug 2026 Detailed Pass In date
MTH-CS-173 Mt Holland — processing plant Flotation Control station Ex de Zone 2 IIC T4 10 Sep 2026 Detailed Minor defect In date
MTH-HT-126 Mt Holland — processing plant Flotation Heater Ex e Zone 1 IIB T4 09 Sep 2026 Detailed Pass In date
MTH-JB-100 Mt Holland — processing plant Flotation Junction box Ex e Zone 2 IIB T6 31 Aug 2026 Detailed Pass In date
MTH-JB-165 Mt Holland — processing plant Flotation Junction box Ex e Zone 2 IIB T3 10 Sep 2026 Detailed Pass In date
MTH-JB-175 Mt Holland — processing plant Flotation Junction box Ex e Zone 1 IIB T6 14 Sep 2026 Detailed Minor defect In date
MTH-LT-141 Mt Holland — processing plant Flotation Level transmitter Ex ia Zone 2 IIB T4 10 Sep 2026 Detailed Minor defect In date
MTH-LT-142 Mt Holland — processing plant Flotation Light fitting Ex d Zone 2 IIA T3 14 Aug 2026 Detailed Pass In date
MTH-LT-170 Mt Holland — processing plant Flotation Level transmitter Ex ia Zone 2 IIB T4 25 Aug 2026 Detailed Pass In date
MTH-PP-168 Mt Holland — processing plant Flotation Purged panel Ex p Zone 2 IIB T6 17 Sep 2026 Detailed Pass In date
MTH-SV-145 Mt Holland — processing plant Flotation Solenoid valve Ex ia Zone 2 IIC T6 25 Aug 2026 Detailed Pass In date
MTH-CG-150 Mt Holland — processing plant Reagent store Cable gland set Ex e Zone 2 IIA T3 31 Aug 2026 Detailed Pass In date
MTH-JB-116 Mt Holland — processing plant Reagent store Junction box Ex e Zone 2 IIC T4 13 Aug 2026 Detailed Pass In date
MTH-JB-127 Mt Holland — processing plant Reagent store Junction box Ex e Zone 2 IIC T3 02 Sep 2026 Detailed Major defect In date
MTH-JB-135 Mt Holland — processing plant Reagent store Junction box Ex e Zone 1 IIA T4 27 Aug 2026 Detailed Pass In date
MTH-PP-162 Mt Holland — processing plant Reagent store Purged panel Ex p Zone 2 IIA T3 21 Aug 2026 Detailed Pass In date
MTH-SO-130 Mt Holland — processing plant Reagent store Socket outlet Ex de Zone 2 IIC T4 14 Sep 2026 Detailed Pass In date
MTH-SO-157 Mt Holland — processing plant Reagent store Socket outlet Ex de Zone 1 IIA T4 18 Sep 2026 Detailed Pass In date
PLU-CG-153 Pluto LNG — Train 1 utilities Instrument air Cable gland set Ex e Zone 2 IIB T3 26 Jul 2026 Close Pass In date
PLU-CS-139 Pluto LNG — Train 1 utilities Instrument air Control station Ex de Zone 1 IIB T6 24 Jul 2026 Close Pass In date
PLU-CS-181 Pluto LNG — Train 1 utilities Instrument air Control station Ex de Zone 1 IIC T4 30 Jul 2026 Close Major defect In date
PLU-CS-194 Pluto LNG — Train 1 utilities Instrument air Control station Ex de Zone 2 IIA T4 18 Jul 2026 Close Pass In date
PLU-GD-177 Pluto LNG — Train 1 utilities Instrument air Gas detector Ex d Zone 2 IIA T3 19 Jul 2026 Close Major defect In date
PLU-HT-162 Pluto LNG — Train 1 utilities Instrument air Heater Ex e Zone 2 IIC T3 25 Jul 2026 Close Minor defect In date
PLU-JB-191 Pluto LNG — Train 1 utilities Instrument air Junction box Ex e Zone 2 IIA T4 19 Jul 2026 Close Major defect In date
PLU-JB-199 Pluto LNG — Train 1 utilities Instrument air Junction box Ex e Zone 2 IIA T4 17 Jul 2026 Close Minor defect In date
PLU-LT-196 Pluto LNG — Train 1 utilities Instrument air Light fitting Ex d Zone 2 IIC T6 25 Jul 2026 Close Pass In date
PLU-M-142 Pluto LNG — Train 1 utilities Instrument air Motor Ex de Zone 2 IIB T4 15 Jul 2026 Close Pass In date
PLU-M-178 Pluto LNG — Train 1 utilities Instrument air Motor Ex de Zone 1 IIC T3 15 Jul 2026 Close Major defect In date
PLU-PT-167 Pluto LNG — Train 1 utilities Instrument air Pressure transmitter Ex ia Zone 2 IIC T3 25 Jul 2026 Close Minor defect In date
PLU-PT-170 Pluto LNG — Train 1 utilities Instrument air Pressure transmitter Ex ia Zone 1 IIB T6 28 Jul 2026 Close Pass In date
PLU-SV-123 Pluto LNG — Train 1 utilities Instrument air Solenoid valve Ex ia Zone 1 IIC T6 20 Jul 2026 Close Pass In date
PLU-SV-159 Pluto LNG — Train 1 utilities Instrument air Solenoid valve Ex ia Zone 2 IIA T4 14 Jul 2026 Close Pass In date
PLU-CG-117 Pluto LNG — Train 1 utilities Nitrogen package Cable gland set Ex e Zone 2 IIC T3 28 Jul 2026 Close Major defect In date
PLU-HT-148 Pluto LNG — Train 1 utilities Nitrogen package Heater Ex e Zone 2 IIA T4 17 Jul 2026 Close Pass In date
PLU-LT-100 Pluto LNG — Train 1 utilities Nitrogen package Level transmitter Ex ia Zone 2 IIB T3 26 Jul 2026 Close Pass In date
PLU-LT-107 Pluto LNG — Train 1 utilities Nitrogen package Level transmitter Ex ia Zone 2 IIA T6 16 Jul 2026 Close Pass In date
PLU-LT-156 Pluto LNG — Train 1 utilities Nitrogen package Light fitting Ex d Zone 2 IIB T4 17 Jul 2026 Close Pass In date
PLU-M-147 Pluto LNG — Train 1 utilities Nitrogen package Motor Ex de Zone 1 IIA T3 28 Jul 2026 Close Pass In date
PLU-PP-133 Pluto LNG — Train 1 utilities Nitrogen package Purged panel Ex p Zone 1 IIA T3 22 Jul 2026 Close Pass In date
PLU-PT-138 Pluto LNG — Train 1 utilities Nitrogen package Pressure transmitter Ex ia Zone 1 IIB T4 17 Jul 2026 Close Major defect In date
PLU-SO-185 Pluto LNG — Train 1 utilities Nitrogen package Socket outlet Ex de Zone 2 IIB T6 14 Jul 2026 Close Minor defect In date
PLU-CG-132 Pluto LNG — Train 1 utilities Utility pumps Cable gland set Ex e Zone 1 IIB T6 25 Jul 2026 Close Pass In date
PLU-HT-189 Pluto LNG — Train 1 utilities Utility pumps Heater Ex e Zone 1 IIB T4 26 Jul 2026 Close Pass In date
PLU-JB-105 Pluto LNG — Train 1 utilities Utility pumps Junction box Ex e Zone 1 IIB T4 22 Jul 2026 Close Pass In date
PLU-JB-113 Pluto LNG — Train 1 utilities Utility pumps Junction box Ex e Zone 1 IIA T4 15 Jul 2026 Close Pass In date
PLU-JB-119 Pluto LNG — Train 1 utilities Utility pumps Junction box Ex e Zone 2 IIC T4 19 Jul 2026 Close Pass In date
PLU-LT-163 Pluto LNG — Train 1 utilities Utility pumps Level transmitter Ex ia Zone 2 IIB T3 19 Jul 2026 Close Pass In date
PLU-PP-125 Pluto LNG — Train 1 utilities Utility pumps Purged panel Ex p Zone 2 IIB T4 29 Jul 2026 Close Pass In date
PLU-PP-174 Pluto LNG — Train 1 utilities Utility pumps Purged panel Ex p Zone 2 IIB T4 29 Jul 2026 Close Pass In date
PLU-SO-111 Pluto LNG — Train 1 utilities Utility pumps Socket outlet Ex de Zone 2 IIA T4 19 Jul 2026 Close Pass In date
PLU-SO-128 Pluto LNG — Train 1 utilities Utility pumps Socket outlet Ex de Zone 2 IIA T6 22 Jul 2026 Close Major defect In date