Burrup LNG — Compressor Station 2
Burrup LNG Operations
100%compliant
18 items · 0 open defects
Burrup LNG — Compressor Station 1
Burrup LNG Operations
94%compliant
56 items · 2 open defects · 21 to inspect
Kurra Camp — switchroom & fuel farm
Ironbark Mining Services
100%compliant
22 items · 0 open defects · 13 to inspect
Burrup — compressor station A
Karratha Gas Services
100%compliant
16 items · 0 open defects
Mt Holland — processing plant
Sandstone Lithium
85%compliant
26 items · 4 open defects
Pluto LNG — Train 1 utilities
Woodside Energy
68%compliant
34 items · 11 open defects
| Tag | Site | Area | Equipment | Ex | Zone | Gas | T | Last inspected | Grade | Result | Next due | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| CS1-CG-180 | Burrup LNG — Compressor Station 1 | Compressor house | Cable gland set | Ex e | Zone 1 | IIC | T4 | 29 Sep 2026 | Detailed | Pass | In date | |
| CS1-CS-107 | Burrup LNG — Compressor Station 1 | Compressor house | Control station | Ex de | Zone 2 | IIB | T4 | 21 Sep 2026 | Detailed | Pass | In date | |
| CS1-CS-182 | Burrup LNG — Compressor Station 1 | Compressor house | Control station | Ex de | Zone 2 | IIC | T4 | 30 Sep 2026 | Detailed | Pass | In date | |
| CS1-HT-170 | Burrup LNG — Compressor Station 1 | Compressor house | Heater | Ex e | Zone 1 | IIB | T4 | 28 Sep 2026 | Detailed | Pass | In date | |
| CS1-LT-260 | Burrup LNG — Compressor Station 1 | Compressor house | Level transmitter | Ex ia | Zone 2 | IIA | T4 | — | — | Not inspected | — | |
| CS1-PP-151 | Burrup LNG — Compressor Station 1 | Compressor house | Purged panel | Ex p | Zone 1 | IIA | T6 | 26 Sep 2026 | Detailed | Pass | In date | |
| CS1-PP-188 | Burrup LNG — Compressor Station 1 | Compressor house | Purged panel | Ex p | Zone 2 | IIA | T3 | 30 Sep 2026 | Detailed | Pass | In date | |
| CS1-PT-202 | Burrup LNG — Compressor Station 1 | Compressor house | Pressure transmitter | Ex ia | Zone 2 | IIC | T3 | 02 Oct 2026 | Detailed | Pass | In date | |
| CS1-SO-124 | Burrup LNG — Compressor Station 1 | Compressor house | Socket outlet | Ex de | Zone 2 | IIB | T6 | 23 Sep 2026 | Detailed | Pass | In date | |
| CS1-SO-190 | Burrup LNG — Compressor Station 1 | Compressor house | Socket outlet | Ex de | Zone 1 | IIC | T4 | 01 Oct 2026 | Detailed | Major defect | In date | |
| CS1-SV-142 | Burrup LNG — Compressor Station 1 | Compressor house | Solenoid valve | Ex ia | Zone 2 | IIA | T3 | 25 Sep 2026 | Detailed | Pass | In date | |
| CS1-SV-200 | Burrup LNG — Compressor Station 1 | Compressor house | Solenoid valve | Ex ia | Zone 1 | IIB | T4 | 02 Oct 2026 | Detailed | Pass | In date | |
| CS1-SV-244 | Burrup LNG — Compressor Station 1 | Compressor house | Solenoid valve | Ex ia | Zone 1 | IIB | T6 | — | — | Not inspected | — | |
| CS1-CG-123 | Burrup LNG — Compressor Station 1 | Cooling water pumps | Cable gland set | Ex e | Zone 1 | IIC | T6 | 23 Sep 2026 | Detailed | Pass | In date | |
| CS1-CG-135 | Burrup LNG — Compressor Station 1 | Cooling water pumps | Cable gland set | Ex e | Zone 1 | IIB | T3 | 24 Sep 2026 | Detailed | Minor defect | In date | |
| CS1-CS-110 | Burrup LNG — Compressor Station 1 | Cooling water pumps | Control station | Ex de | Zone 2 | IIB | T3 | 22 Sep 2026 | Detailed | Pass | In date | |
| CS1-CS-198 | Burrup LNG — Compressor Station 1 | Cooling water pumps | Control station | Ex de | Zone 2 | IIA | T4 | 01 Oct 2026 | Detailed | Pass | In date | |
| CS1-CS-213 | Burrup LNG — Compressor Station 1 | Cooling water pumps | Control station | Ex de | Zone 1 | IIC | T6 | — | — | Not inspected | — | |
| CS1-JB-256 | Burrup LNG — Compressor Station 1 | Cooling water pumps | Junction box | Ex e | Zone 2 | IIC | T4 | — | — | Not inspected | — | |
| CS1-LT-158 | Burrup LNG — Compressor Station 1 | Cooling water pumps | Level transmitter | Ex ia | Zone 2 | IIB | T3 | 27 Sep 2026 | Detailed | Pass | In date | |
| CS1-LT-173 | Burrup LNG — Compressor Station 1 | Cooling water pumps | Light fitting | Ex d | Zone 2 | IIC | T6 | 29 Sep 2026 | Detailed | Pass | In date | |
| CS1-M-117 | Burrup LNG — Compressor Station 1 | Cooling water pumps | Motor | Ex de | Zone 1 | IIB | T4 | 22 Sep 2026 | Detailed | Pass | In date | |
| CS1-PP-102 | Burrup LNG — Compressor Station 1 | Cooling water pumps | Purged panel | Ex p | Zone 1 | IIA | T4 | 21 Sep 2026 | Detailed | Pass | In date | |
| CS1-PP-266 | Burrup LNG — Compressor Station 1 | Cooling water pumps | Purged panel | Ex p | Zone 1 | IIB | T4 | — | — | Not inspected | — | |
| CS1-PT-177 | Burrup LNG — Compressor Station 1 | Cooling water pumps | Pressure transmitter | Ex ia | Zone 2 | IIC | T4 | 29 Sep 2026 | Detailed | Pass | In date | |
| CS1-SO-224 | Burrup LNG — Compressor Station 1 | Cooling water pumps | Socket outlet | Ex de | Zone 2 | IIB | T6 | — | — | Not inspected | — | |
| CS1-CG-105 | Burrup LNG — Compressor Station 1 | Fuel gas conditioning | Cable gland set | Ex e | Zone 1 | IIC | T4 | 21 Sep 2026 | Detailed | Pass | In date | |
| CS1-CS-186 | Burrup LNG — Compressor Station 1 | Fuel gas conditioning | Control station | Ex de | Zone 1 | IIB | T3 | 30 Sep 2026 | Detailed | Pass | In date | |
| CS1-CS-235 | Burrup LNG — Compressor Station 1 | Fuel gas conditioning | Control station | Ex de | Zone 1 | IIB | T3 | — | — | Not inspected | — | |
| CS1-HT-234 | Burrup LNG — Compressor Station 1 | Fuel gas conditioning | Heater | Ex e | Zone 1 | IIA | T4 | — | — | Not inspected | — | |
| CS1-HT-255 | Burrup LNG — Compressor Station 1 | Fuel gas conditioning | Heater | Ex e | Zone 1 | IIB | T6 | — | — | Not inspected | — | |
| CS1-LT-119 | Burrup LNG — Compressor Station 1 | Fuel gas conditioning | Light fitting | Ex d | Zone 1 | IIA | T3 | 23 Sep 2026 | Detailed | Pass | In date | |
| CS1-LT-155 | Burrup LNG — Compressor Station 1 | Fuel gas conditioning | Level transmitter | Ex ia | Zone 1 | IIB | T3 | 27 Sep 2026 | Detailed | Pass | In date | |
| CS1-LT-207 | Burrup LNG — Compressor Station 1 | Fuel gas conditioning | Light fitting | Ex d | Zone 1 | IIC | T6 | — | — | Not inspected | — | |
| CS1-PP-136 | Burrup LNG — Compressor Station 1 | Fuel gas conditioning | Purged panel | Ex p | Zone 1 | IIB | T4 | 25 Sep 2026 | Detailed | Pass | In date | |
| CS1-PP-163 | Burrup LNG — Compressor Station 1 | Fuel gas conditioning | Purged panel | Ex p | Zone 1 | IIB | T6 | 28 Sep 2026 | Detailed | Pass | In date | |
| CS1-PT-242 | Burrup LNG — Compressor Station 1 | Fuel gas conditioning | Pressure transmitter | Ex ia | Zone 1 | IIB | T6 | — | — | Not inspected | — | |
| CS1-SO-147 | Burrup LNG — Compressor Station 1 | Fuel gas conditioning | Socket outlet | Ex de | Zone 1 | IIC | T6 | 26 Sep 2026 | Detailed | Pass | In date | |
| CS1-SO-217 | Burrup LNG — Compressor Station 1 | Fuel gas conditioning | Socket outlet | Ex de | Zone 1 | IIC | T3 | — | — | Not inspected | — | |
| CS1-SV-249 | Burrup LNG — Compressor Station 1 | Fuel gas conditioning | Solenoid valve | Ex ia | Zone 1 | IIB | T4 | — | — | Not inspected | — | |
| CS1-CG-226 | Burrup LNG — Compressor Station 1 | Lube oil skid | Cable gland set | Ex e | Zone 1 | IIC | T3 | — | — | Not inspected | — | |
| CS1-CS-208 | Burrup LNG — Compressor Station 1 | Lube oil skid | Control station | Ex de | Zone 2 | IIC | T3 | — | — | Not inspected | — | |
| CS1-CS-238 | Burrup LNG — Compressor Station 1 | Lube oil skid | Control station | Ex de | Zone 2 | IIB | T3 | — | — | Not inspected | — | |
| CS1-GD-161 | Burrup LNG — Compressor Station 1 | Lube oil skid | Gas detector | Ex d | Zone 1 | IIA | T3 | 27 Sep 2026 | Detailed | Pass | In date | |
| CS1-JB-166 | Burrup LNG — Compressor Station 1 | Lube oil skid | Junction box | Ex e | Zone 1 | IIB | T4 | 28 Sep 2026 | Detailed | Pass | In date | |
| CS1-JB-229 | Burrup LNG — Compressor Station 1 | Lube oil skid | Junction box | Ex e | Zone 2 | IIB | T6 | — | — | Not inspected | — | |
| CS1-JB-252 | Burrup LNG — Compressor Station 1 | Lube oil skid | Junction box | Ex e | Zone 2 | IIC | T3 | — | — | Not inspected | — | |
| CS1-LT-139 | Burrup LNG — Compressor Station 1 | Lube oil skid | Light fitting | Ex d | Zone 2 | IIB | T6 | 25 Sep 2026 | Detailed | Pass | In date | |
| CS1-LT-216 | Burrup LNG — Compressor Station 1 | Lube oil skid | Level transmitter | Ex ia | Zone 2 | IIB | T4 | — | — | Not inspected | — | |
| CS1-LT-222 | Burrup LNG — Compressor Station 1 | Lube oil skid | Light fitting | Ex d | Zone 2 | IIB | T4 | — | — | Not inspected | — | |
| CS1-LT-264 | Burrup LNG — Compressor Station 1 | Lube oil skid | Level transmitter | Ex ia | Zone 1 | IIC | T6 | — | — | Not inspected | — | |
| CS1-M-113 | Burrup LNG — Compressor Station 1 | Lube oil skid | Motor | Ex de | Zone 1 | IIA | T3 | 22 Sep 2026 | Detailed | Pass | In date | |
| CS1-M-130 | Burrup LNG — Compressor Station 1 | Lube oil skid | Motor | Ex de | Zone 1 | IIB | T6 | 24 Sep 2026 | Detailed | Pass | In date | |
| CS1-M-195 | Burrup LNG — Compressor Station 1 | Lube oil skid | Motor | Ex de | Zone 2 | IIB | T6 | 01 Oct 2026 | Detailed | Pass | In date | |
| CS1-PT-129 | Burrup LNG — Compressor Station 1 | Lube oil skid | Pressure transmitter | Ex ia | Zone 1 | IIA | T3 | 24 Sep 2026 | Detailed | Pass | In date | |
| CS1-PT-149 | Burrup LNG — Compressor Station 1 | Lube oil skid | Pressure transmitter | Ex ia | Zone 2 | IIB | T6 | 26 Sep 2026 | Detailed | Pass | In date | |
| CS2-CG-102 | Burrup LNG — Compressor Station 2 | Compressor house | Cable gland set | Ex e | Zone 2 | IIB | T6 | 26 Oct 2023 | Detailed | Pass | In date | |
| CS2-CG-115 | Burrup LNG — Compressor Station 2 | Compressor house | Cable gland set | Ex e | Zone 2 | IIB | T4 | 22 Oct 2023 | Detailed | Pass | In date | |
| CS2-CG-137 | Burrup LNG — Compressor Station 2 | Compressor house | Cable gland set | Ex e | Zone 2 | IIA | T4 | 14 Oct 2023 | Detailed | Pass | In date | |
| CS2-HT-120 | Burrup LNG — Compressor Station 2 | Compressor house | Heater | Ex e | Zone 1 | IIB | T4 | 29 Oct 2023 | Detailed | Pass | In date | |
| CS2-JB-111 | Burrup LNG — Compressor Station 2 | Compressor house | Junction box | Ex e | Zone 1 | IIB | T3 | 23 Oct 2023 | Detailed | Pass | In date | |
| CS2-LT-145 | Burrup LNG — Compressor Station 2 | Compressor house | Level transmitter | Ex ia | Zone 2 | IIB | T3 | 26 Oct 2023 | Detailed | Pass | In date | |
| CS2-M-139 | Burrup LNG — Compressor Station 2 | Compressor house | Motor | Ex de | Zone 2 | IIB | T4 | 27 Oct 2023 | Detailed | Pass | In date | |
| CS2-PP-144 | Burrup LNG — Compressor Station 2 | Compressor house | Purged panel | Ex p | Zone 1 | IIA | T4 | 28 Oct 2023 | Detailed | Pass | In date | |
| CS2-PT-105 | Burrup LNG — Compressor Station 2 | Compressor house | Pressure transmitter | Ex ia | Zone 1 | IIB | T4 | 29 Oct 2023 | Detailed | Pass | In date | |
| CS2-SO-121 | Burrup LNG — Compressor Station 2 | Compressor house | Socket outlet | Ex de | Zone 2 | IIB | T6 | 21 Oct 2023 | Detailed | Pass | In date | |
| CS2-SV-127 | Burrup LNG — Compressor Station 2 | Compressor house | Solenoid valve | Ex ia | Zone 2 | IIA | T3 | 15 Oct 2023 | Detailed | Pass | In date | |
| CS2-CG-112 | Burrup LNG — Compressor Station 2 | Scrubbers | Cable gland set | Ex e | Zone 2 | IIB | T3 | 25 Oct 2023 | Detailed | Pass | In date | |
| CS2-JB-126 | Burrup LNG — Compressor Station 2 | Scrubbers | Junction box | Ex e | Zone 2 | IIA | T4 | 28 Oct 2023 | Detailed | Pass | In date | |
| CS2-LT-135 | Burrup LNG — Compressor Station 2 | Scrubbers | Light fitting | Ex d | Zone 1 | IIB | T4 | 18 Oct 2023 | Detailed | Pass | In date | |
| CS2-PP-130 | Burrup LNG — Compressor Station 2 | Scrubbers | Purged panel | Ex p | Zone 2 | IIC | T3 | 15 Oct 2023 | Detailed | Pass | In date | |
| CS2-PT-150 | Burrup LNG — Compressor Station 2 | Scrubbers | Pressure transmitter | Ex ia | Zone 2 | IIB | T6 | 21 Oct 2023 | Detailed | Pass | In date | |
| CS2-SO-151 | Burrup LNG — Compressor Station 2 | Scrubbers | Socket outlet | Ex de | Zone 1 | IIC | T3 | 01 Nov 2023 | Detailed | Pass | In date | |
| CS2-SV-106 | Burrup LNG — Compressor Station 2 | Scrubbers | Solenoid valve | Ex ia | Zone 1 | IIC | T4 | 17 Oct 2023 | Detailed | Pass | In date | |
| KGA-CS-131 | Burrup — compressor station A | Compressor bay | Control station | Ex de | Zone 1 | IIB | T3 | 31 May 2026 | Detailed | Pass | In date | |
| KGA-HT-100 | Burrup — compressor station A | Compressor bay | Heater | Ex e | Zone 1 | IIB | T4 | 17 May 2026 | Detailed | Pass | In date | |
| KGA-HT-142 | Burrup — compressor station A | Compressor bay | Heater | Ex e | Zone 2 | IIB | T6 | 21 May 2026 | Detailed | Pass | In date | |
| KGA-JB-133 | Burrup — compressor station A | Compressor bay | Junction box | Ex e | Zone 2 | IIC | T4 | 31 May 2026 | Detailed | Pass | In date | |
| KGA-LT-113 | Burrup — compressor station A | Compressor bay | Light fitting | Ex d | Zone 2 | IIB | T3 | 24 May 2026 | Detailed | Pass | In date | |
| KGA-M-118 | Burrup — compressor station A | Compressor bay | Motor | Ex de | Zone 2 | IIB | T4 | 30 May 2026 | Detailed | Pass | In date | |
| KGA-SV-106 | Burrup — compressor station A | Compressor bay | Solenoid valve | Ex ia | Zone 1 | IIC | T4 | 24 May 2026 | Detailed | Pass | In date | |
| KGA-CG-110 | Burrup — compressor station A | Metering | Cable gland set | Ex e | Zone 2 | IIC | T4 | 17 May 2026 | Detailed | Pass | In date | |
| KGA-LT-103 | Burrup — compressor station A | Metering | Level transmitter | Ex ia | Zone 1 | IIB | T4 | 23 May 2026 | Detailed | Pass | In date | |
| KGA-LT-117 | Burrup — compressor station A | Metering | Level transmitter | Ex ia | Zone 2 | IIA | T6 | 01 Jun 2026 | Detailed | Pass | In date | |
| KGA-LT-137 | Burrup — compressor station A | Metering | Level transmitter | Ex ia | Zone 1 | IIA | T3 | 15 May 2026 | Detailed | Pass | In date | |
| KGA-LT-145 | Burrup — compressor station A | Metering | Light fitting | Ex d | Zone 2 | IIC | T4 | 26 May 2026 | Detailed | Pass | In date | |
| KGA-M-126 | Burrup — compressor station A | Metering | Motor | Ex de | Zone 2 | IIA | T4 | 29 May 2026 | Detailed | Pass | In date | |
| KGA-PT-121 | Burrup — compressor station A | Metering | Pressure transmitter | Ex ia | Zone 2 | IIA | T4 | 17 May 2026 | Detailed | Pass | In date | |
| KGA-SO-129 | Burrup — compressor station A | Metering | Socket outlet | Ex de | Zone 2 | IIB | T6 | 23 May 2026 | Detailed | Pass | In date | |
| KGA-SV-141 | Burrup — compressor station A | Metering | Solenoid valve | Ex ia | Zone 1 | IIB | T6 | 16 May 2026 | Detailed | Pass | In date | |
| KUR-CS-132 | Kurra Camp — switchroom & fuel farm | Bowser island | Control station | Ex de | Zone 1 | IIC | T4 | — | — | Not inspected | — | |
| KUR-CS-160 | Kurra Camp — switchroom & fuel farm | Bowser island | Control station | Ex de | Zone 1 | IIB | T6 | — | — | Not inspected | — | |
| KUR-GD-147 | Kurra Camp — switchroom & fuel farm | Bowser island | Gas detector | Ex d | Zone 1 | IIA | T3 | — | — | Not inspected | — | |
| KUR-HT-129 | Kurra Camp — switchroom & fuel farm | Bowser island | Heater | Ex e | Zone 1 | IIC | T4 | — | — | Not inspected | — | |
| KUR-LT-109 | Kurra Camp — switchroom & fuel farm | Bowser island | Light fitting | Ex d | Zone 1 | IIC | T4 | 18 Sep 2026 | Detailed | Pass | In date | |
| KUR-LT-133 | Kurra Camp — switchroom & fuel farm | Bowser island | Light fitting | Ex d | Zone 1 | IIA | T4 | — | — | Not inspected | — | |
| KUR-SV-126 | Kurra Camp — switchroom & fuel farm | Bowser island | Solenoid valve | Ex ia | Zone 1 | IIA | T3 | 23 Sep 2026 | Detailed | Pass | In date | |
| KUR-CG-142 | Kurra Camp — switchroom & fuel farm | Fuel farm | Cable gland set | Ex e | Zone 1 | IIA | T4 | — | — | Not inspected | — | |
| KUR-CG-151 | Kurra Camp — switchroom & fuel farm | Fuel farm | Cable gland set | Ex e | Zone 1 | IIC | T6 | — | — | Not inspected | — | |
| KUR-CG-164 | Kurra Camp — switchroom & fuel farm | Fuel farm | Cable gland set | Ex e | Zone 1 | IIC | T4 | — | — | Not inspected | — | |
| KUR-HT-108 | Kurra Camp — switchroom & fuel farm | Fuel farm | Heater | Ex e | Zone 1 | IIC | T4 | 17 Sep 2026 | Detailed | Pass | In date | |
| KUR-JB-158 | Kurra Camp — switchroom & fuel farm | Fuel farm | Junction box | Ex e | Zone 1 | IIC | T6 | — | — | Not inspected | — | |
| KUR-SO-102 | Kurra Camp — switchroom & fuel farm | Fuel farm | Socket outlet | Ex de | Zone 1 | IIC | T6 | 15 Sep 2026 | Detailed | Pass | In date | |
| KUR-SO-149 | Kurra Camp — switchroom & fuel farm | Fuel farm | Socket outlet | Ex de | Zone 1 | IIA | T4 | — | — | Not inspected | — | |
| KUR-SV-112 | Kurra Camp — switchroom & fuel farm | Fuel farm | Solenoid valve | Ex ia | Zone 1 | IIA | T6 | 19 Sep 2026 | Detailed | Pass | In date | |
| KUR-CG-140 | Kurra Camp — switchroom & fuel farm | Generator yard | Cable gland set | Ex e | Zone 2 | IIB | T3 | — | — | Not inspected | — | |
| KUR-CS-137 | Kurra Camp — switchroom & fuel farm | Generator yard | Control station | Ex de | Zone 1 | IIB | T4 | — | — | Not inspected | — | |
| KUR-GD-122 | Kurra Camp — switchroom & fuel farm | Generator yard | Gas detector | Ex d | Zone 1 | IIA | T3 | 22 Sep 2026 | Detailed | Pass | In date | |
| KUR-HT-156 | Kurra Camp — switchroom & fuel farm | Generator yard | Heater | Ex e | Zone 2 | IIC | T6 | — | — | Not inspected | — | |
| KUR-JB-105 | Kurra Camp — switchroom & fuel farm | Generator yard | Junction box | Ex e | Zone 1 | IIB | T4 | 16 Sep 2026 | Detailed | Pass | In date | |
| KUR-LT-120 | Kurra Camp — switchroom & fuel farm | Generator yard | Level transmitter | Ex ia | Zone 2 | IIC | T6 | 21 Sep 2026 | Detailed | Pass | In date | |
| KUR-SV-117 | Kurra Camp — switchroom & fuel farm | Generator yard | Solenoid valve | Ex ia | Zone 2 | IIC | T6 | 20 Sep 2026 | Detailed | Pass | In date | |
| MTH-JB-106 | Mt Holland — processing plant | Diesel storage | Junction box | Ex e | Zone 1 | IIC | T6 | 14 Aug 2026 | Detailed | Pass | In date | |
| MTH-JB-120 | Mt Holland — processing plant | Diesel storage | Junction box | Ex e | Zone 1 | IIC | T4 | 15 Sep 2026 | Detailed | Pass | In date | |
| MTH-LT-151 | Mt Holland — processing plant | Diesel storage | Level transmitter | Ex ia | Zone 1 | IIC | T3 | 24 Aug 2026 | Detailed | Pass | In date | |
| MTH-M-110 | Mt Holland — processing plant | Diesel storage | Motor | Ex de | Zone 1 | IIA | T4 | 31 Aug 2026 | Detailed | Pass | In date | |
| MTH-PP-156 | Mt Holland — processing plant | Diesel storage | Purged panel | Ex p | Zone 1 | IIA | T6 | 30 Aug 2026 | Detailed | Pass | In date | |
| MTH-SO-123 | Mt Holland — processing plant | Diesel storage | Socket outlet | Ex de | Zone 1 | IIC | T4 | 18 Sep 2026 | Detailed | Pass | In date | |
| MTH-SV-103 | Mt Holland — processing plant | Diesel storage | Solenoid valve | Ex ia | Zone 1 | IIA | T4 | 31 Aug 2026 | Detailed | Pass | In date | |
| MTH-CS-114 | Mt Holland — processing plant | Flotation | Control station | Ex de | Zone 2 | IIB | T4 | 12 Aug 2026 | Detailed | Pass | In date | |
| MTH-CS-138 | Mt Holland — processing plant | Flotation | Control station | Ex de | Zone 2 | IIA | T6 | 12 Aug 2026 | Detailed | Pass | In date | |
| MTH-CS-173 | Mt Holland — processing plant | Flotation | Control station | Ex de | Zone 2 | IIC | T4 | 10 Sep 2026 | Detailed | Minor defect | In date | |
| MTH-HT-126 | Mt Holland — processing plant | Flotation | Heater | Ex e | Zone 1 | IIB | T4 | 09 Sep 2026 | Detailed | Pass | In date | |
| MTH-JB-100 | Mt Holland — processing plant | Flotation | Junction box | Ex e | Zone 2 | IIB | T6 | 31 Aug 2026 | Detailed | Pass | In date | |
| MTH-JB-165 | Mt Holland — processing plant | Flotation | Junction box | Ex e | Zone 2 | IIB | T3 | 10 Sep 2026 | Detailed | Pass | In date | |
| MTH-JB-175 | Mt Holland — processing plant | Flotation | Junction box | Ex e | Zone 1 | IIB | T6 | 14 Sep 2026 | Detailed | Minor defect | In date | |
| MTH-LT-141 | Mt Holland — processing plant | Flotation | Level transmitter | Ex ia | Zone 2 | IIB | T4 | 10 Sep 2026 | Detailed | Minor defect | In date | |
| MTH-LT-142 | Mt Holland — processing plant | Flotation | Light fitting | Ex d | Zone 2 | IIA | T3 | 14 Aug 2026 | Detailed | Pass | In date | |
| MTH-LT-170 | Mt Holland — processing plant | Flotation | Level transmitter | Ex ia | Zone 2 | IIB | T4 | 25 Aug 2026 | Detailed | Pass | In date | |
| MTH-PP-168 | Mt Holland — processing plant | Flotation | Purged panel | Ex p | Zone 2 | IIB | T6 | 17 Sep 2026 | Detailed | Pass | In date | |
| MTH-SV-145 | Mt Holland — processing plant | Flotation | Solenoid valve | Ex ia | Zone 2 | IIC | T6 | 25 Aug 2026 | Detailed | Pass | In date | |
| MTH-CG-150 | Mt Holland — processing plant | Reagent store | Cable gland set | Ex e | Zone 2 | IIA | T3 | 31 Aug 2026 | Detailed | Pass | In date | |
| MTH-JB-116 | Mt Holland — processing plant | Reagent store | Junction box | Ex e | Zone 2 | IIC | T4 | 13 Aug 2026 | Detailed | Pass | In date | |
| MTH-JB-127 | Mt Holland — processing plant | Reagent store | Junction box | Ex e | Zone 2 | IIC | T3 | 02 Sep 2026 | Detailed | Major defect | In date | |
| MTH-JB-135 | Mt Holland — processing plant | Reagent store | Junction box | Ex e | Zone 1 | IIA | T4 | 27 Aug 2026 | Detailed | Pass | In date | |
| MTH-PP-162 | Mt Holland — processing plant | Reagent store | Purged panel | Ex p | Zone 2 | IIA | T3 | 21 Aug 2026 | Detailed | Pass | In date | |
| MTH-SO-130 | Mt Holland — processing plant | Reagent store | Socket outlet | Ex de | Zone 2 | IIC | T4 | 14 Sep 2026 | Detailed | Pass | In date | |
| MTH-SO-157 | Mt Holland — processing plant | Reagent store | Socket outlet | Ex de | Zone 1 | IIA | T4 | 18 Sep 2026 | Detailed | Pass | In date | |
| PLU-CG-153 | Pluto LNG — Train 1 utilities | Instrument air | Cable gland set | Ex e | Zone 2 | IIB | T3 | 26 Jul 2026 | Close | Pass | In date | |
| PLU-CS-139 | Pluto LNG — Train 1 utilities | Instrument air | Control station | Ex de | Zone 1 | IIB | T6 | 24 Jul 2026 | Close | Pass | In date | |
| PLU-CS-181 | Pluto LNG — Train 1 utilities | Instrument air | Control station | Ex de | Zone 1 | IIC | T4 | 30 Jul 2026 | Close | Major defect | In date | |
| PLU-CS-194 | Pluto LNG — Train 1 utilities | Instrument air | Control station | Ex de | Zone 2 | IIA | T4 | 18 Jul 2026 | Close | Pass | In date | |
| PLU-GD-177 | Pluto LNG — Train 1 utilities | Instrument air | Gas detector | Ex d | Zone 2 | IIA | T3 | 19 Jul 2026 | Close | Major defect | In date | |
| PLU-HT-162 | Pluto LNG — Train 1 utilities | Instrument air | Heater | Ex e | Zone 2 | IIC | T3 | 25 Jul 2026 | Close | Minor defect | In date | |
| PLU-JB-191 | Pluto LNG — Train 1 utilities | Instrument air | Junction box | Ex e | Zone 2 | IIA | T4 | 19 Jul 2026 | Close | Major defect | In date | |
| PLU-JB-199 | Pluto LNG — Train 1 utilities | Instrument air | Junction box | Ex e | Zone 2 | IIA | T4 | 17 Jul 2026 | Close | Minor defect | In date | |
| PLU-LT-196 | Pluto LNG — Train 1 utilities | Instrument air | Light fitting | Ex d | Zone 2 | IIC | T6 | 25 Jul 2026 | Close | Pass | In date | |
| PLU-M-142 | Pluto LNG — Train 1 utilities | Instrument air | Motor | Ex de | Zone 2 | IIB | T4 | 15 Jul 2026 | Close | Pass | In date | |
| PLU-M-178 | Pluto LNG — Train 1 utilities | Instrument air | Motor | Ex de | Zone 1 | IIC | T3 | 15 Jul 2026 | Close | Major defect | In date | |
| PLU-PT-167 | Pluto LNG — Train 1 utilities | Instrument air | Pressure transmitter | Ex ia | Zone 2 | IIC | T3 | 25 Jul 2026 | Close | Minor defect | In date | |
| PLU-PT-170 | Pluto LNG — Train 1 utilities | Instrument air | Pressure transmitter | Ex ia | Zone 1 | IIB | T6 | 28 Jul 2026 | Close | Pass | In date | |
| PLU-SV-123 | Pluto LNG — Train 1 utilities | Instrument air | Solenoid valve | Ex ia | Zone 1 | IIC | T6 | 20 Jul 2026 | Close | Pass | In date | |
| PLU-SV-159 | Pluto LNG — Train 1 utilities | Instrument air | Solenoid valve | Ex ia | Zone 2 | IIA | T4 | 14 Jul 2026 | Close | Pass | In date | |
| PLU-CG-117 | Pluto LNG — Train 1 utilities | Nitrogen package | Cable gland set | Ex e | Zone 2 | IIC | T3 | 28 Jul 2026 | Close | Major defect | In date | |
| PLU-HT-148 | Pluto LNG — Train 1 utilities | Nitrogen package | Heater | Ex e | Zone 2 | IIA | T4 | 17 Jul 2026 | Close | Pass | In date | |
| PLU-LT-100 | Pluto LNG — Train 1 utilities | Nitrogen package | Level transmitter | Ex ia | Zone 2 | IIB | T3 | 26 Jul 2026 | Close | Pass | In date | |
| PLU-LT-107 | Pluto LNG — Train 1 utilities | Nitrogen package | Level transmitter | Ex ia | Zone 2 | IIA | T6 | 16 Jul 2026 | Close | Pass | In date | |
| PLU-LT-156 | Pluto LNG — Train 1 utilities | Nitrogen package | Light fitting | Ex d | Zone 2 | IIB | T4 | 17 Jul 2026 | Close | Pass | In date | |
| PLU-M-147 | Pluto LNG — Train 1 utilities | Nitrogen package | Motor | Ex de | Zone 1 | IIA | T3 | 28 Jul 2026 | Close | Pass | In date | |
| PLU-PP-133 | Pluto LNG — Train 1 utilities | Nitrogen package | Purged panel | Ex p | Zone 1 | IIA | T3 | 22 Jul 2026 | Close | Pass | In date | |
| PLU-PT-138 | Pluto LNG — Train 1 utilities | Nitrogen package | Pressure transmitter | Ex ia | Zone 1 | IIB | T4 | 17 Jul 2026 | Close | Major defect | In date | |
| PLU-SO-185 | Pluto LNG — Train 1 utilities | Nitrogen package | Socket outlet | Ex de | Zone 2 | IIB | T6 | 14 Jul 2026 | Close | Minor defect | In date | |
| PLU-CG-132 | Pluto LNG — Train 1 utilities | Utility pumps | Cable gland set | Ex e | Zone 1 | IIB | T6 | 25 Jul 2026 | Close | Pass | In date | |
| PLU-HT-189 | Pluto LNG — Train 1 utilities | Utility pumps | Heater | Ex e | Zone 1 | IIB | T4 | 26 Jul 2026 | Close | Pass | In date | |
| PLU-JB-105 | Pluto LNG — Train 1 utilities | Utility pumps | Junction box | Ex e | Zone 1 | IIB | T4 | 22 Jul 2026 | Close | Pass | In date | |
| PLU-JB-113 | Pluto LNG — Train 1 utilities | Utility pumps | Junction box | Ex e | Zone 1 | IIA | T4 | 15 Jul 2026 | Close | Pass | In date | |
| PLU-JB-119 | Pluto LNG — Train 1 utilities | Utility pumps | Junction box | Ex e | Zone 2 | IIC | T4 | 19 Jul 2026 | Close | Pass | In date | |
| PLU-LT-163 | Pluto LNG — Train 1 utilities | Utility pumps | Level transmitter | Ex ia | Zone 2 | IIB | T3 | 19 Jul 2026 | Close | Pass | In date | |
| PLU-PP-125 | Pluto LNG — Train 1 utilities | Utility pumps | Purged panel | Ex p | Zone 2 | IIB | T4 | 29 Jul 2026 | Close | Pass | In date | |
| PLU-PP-174 | Pluto LNG — Train 1 utilities | Utility pumps | Purged panel | Ex p | Zone 2 | IIB | T4 | 29 Jul 2026 | Close | Pass | In date | |
| PLU-SO-111 | Pluto LNG — Train 1 utilities | Utility pumps | Socket outlet | Ex de | Zone 2 | IIA | T4 | 19 Jul 2026 | Close | Pass | In date | |
| PLU-SO-128 | Pluto LNG — Train 1 utilities | Utility pumps | Socket outlet | Ex de | Zone 2 | IIA | T6 | 22 Jul 2026 | Close | Major defect | In date | |