Blackout Performance

Job SJ-26-0501

Technician app — unassigned
Demo 09 Oct 2026
BP20-0009 · Scheduled service
Kalgoorlie Workers Village
0 / 19
Quarterly service — BP20-0009 (Kalgoorlie Workers Village)
— · 3 h booked · last serviced 02 Jul 2026
Great Eastern Hwy, Kalgoorlie WA 6430
Access: Reception 24 h.
Overdue since 3 Oct — Brendan asked to wait until crews rotate.
Sauna
Heater elements tested — resistance within spec
Stones inspected, re-stacked, crumbled stones replaced
Controller & temperature sensor tested
Sauna temperature reached °C
Time to temperature min
Benches cleaned, sanded where needed and oiled
Door glass, hinges and seal inspected
Vent valve operating
Ice room
Ice room temperature reached °C
Condensing unit coils cleaned
Evaporator fan & condensate drain checked
Door gasket & heater strip checked
Return-air filter replaced
Electrical & safety
RCD trip test ms
Isolator, inlet and leads inspected
Lighting & emergency stop working
Safe-use signage present & legible
Exterior
Container, deck & steps inspected
Before & after photos taken
Photos
Before & after photos go here.
Parts used
OIL-BNCH Bench oil / paraffin finish 1 L1 btl
CLN-SAN Sauna cleaner / sanitiser 5 L1 ea
FLT-AIR Ice room return-air filter1 ea
Time
Logged automatically at sign-off if left blank.
Findings
Customer sign-off
Sign above