To scheduleScheduledIn progressCompleteInvoiced Scheduled service High
Checklist0 / 19
Sauna
Heater elements tested — resistance within spec
Stones inspected, re-stacked, crumbled stones replaced
Controller & temperature sensor tested
Sauna temperature reached— °C
Time to temperature— min
Benches cleaned, sanded where needed and oiled
Door glass, hinges and seal inspected
Vent valve operating
Ice room
Ice room temperature reached— °C
Condensing unit coils cleaned
Evaporator fan & condensate drain checked
Door gasket & heater strip checked
Return-air filter replaced
Electrical & safety
RCD trip test— ms
Isolator, inlet and leads inspected
Lighting & emergency stop working
Safe-use signage present & legible
Exterior
Container, deck & steps inspected
Before & after photos taken
Photos
No photos yet.
Partsallocated now, issued from stock on sign-off
| Part | Qty | |||
|---|---|---|---|---|
| OIL-BNCH — Bench oil / paraffin finish 1 L | 1 | btl | Allocated | |
| CLN-SAN — Sauna cleaner / sanitiser 5 L | 1 | ea | Allocated | |
| FLT-AIR — Ice room return-air filter | 1 | ea | Allocated | |
Timesheet0 h
| Date | Who | Type | Hours | Note |
|---|
Nothing here yet — use “Log time” to create the first one.
- Customer
- Westline Civil Contractors
- Site
- Kalgoorlie Workers VillageGreat Eastern Hwy, Kalgoorlie WA 6430
- Unit
- BP20-0009
- Technician
- Unassigned
- Scheduled
- — · 3 h
- Charging
- Covered by lease
Site access: Reception 24 h.
Overdue since 3 Oct — Brendan asked to wait until crews rotate.
Sign-off
Waiting for the technician — 0 of 19 checks done. The customer signs on the technician's phone.