To scheduleScheduledIn progressCompleteInvoiced Scheduled service
Checklist0 / 14
Sauna
Heater elements tested — resistance within spec
Stones inspected, re-stacked, crumbled stones replaced
Controller & temperature sensor tested
Sauna temperature reached— °C
Time to temperature— min
Benches cleaned, sanded where needed and oiled
Door glass, hinges and seal inspected
Vent valve operating
Electrical & safety
RCD trip test— ms
Isolator, inlet and leads inspected
Lighting & emergency stop working
Safe-use signage present & legible
Exterior
Container, deck & steps inspected
Before & after photos taken
Photos
No photos yet.
Partsallocated now, issued from stock on sign-off
| Part | Qty | |||
|---|---|---|---|---|
| OIL-BNCH — Bench oil / paraffin finish 1 L | 1 | btl | Allocated | |
| CLN-SAN — Sauna cleaner / sanitiser 5 L | 1 | ea | Allocated | |
Timesheet0 h
| Date | Who | Type | Hours | Note |
|---|
Nothing here yet — use “Log time” to create the first one.
- Customer
- Murchison Copper Operations
- Site
- Yalgoo CampYalgoo–Ninghan Road, Yalgoo WA 6635
- Unit
- BP20-0004
- Technician
- Goldfields Electrical Services
- Scheduled
- 12 Oct 2026 · 08:00 · 3 h
- Charging
- Covered by lease
Site access: Unsealed final 40 km — 4WD after rain.
Sign-off
Waiting for the technician — 0 of 14 checks done. The customer signs on the technician's phone.