To scheduleScheduledIn progressCompleteInvoiced Scheduled service
Checklist9 / 19
Sauna
✓Heater elements tested — resistance within spec
✓Stones inspected, re-stacked, crumbled stones replaced
✓Controller & temperature sensor tested
✓Sauna temperature reached87 °C
✓Time to temperature36 min
✓Benches cleaned, sanded where needed and oiled
✓Door glass, hinges and seal inspected
✓Vent valve operating
Ice room
✓Ice room temperature reached-9 °C
Condensing unit coils cleaned
Evaporator fan & condensate drain checked
Door gasket & heater strip checked
Return-air filter replaced
Electrical & safety
RCD trip test— ms
Isolator, inlet and leads inspected
Lighting & emergency stop working
Safe-use signage present & legible
Exterior
Container, deck & steps inspected
Before & after photos taken
Photos
No photos yet.
Partsallocated now, issued from stock on sign-off
| Part | Qty | |||
|---|---|---|---|---|
| OIL-BNCH — Bench oil / paraffin finish 1 L | 1 | btl | Allocated | |
| CLN-SAN — Sauna cleaner / sanitiser 5 L | 1 | ea | Allocated | |
| FLT-AIR — Ice room return-air filter | 1 | ea | Allocated | |
Timesheet3 h
| Date | Who | Type | Hours | Note | |
|---|---|---|---|---|---|
| 09 Oct 2026 | Kade Morrison | Travel | 1.5 | Camp → site | |
| 09 Oct 2026 | Kade Morrison | On site | 1.5 | — | |
- Customer
- Ironbark Mining Services
- Site
- Ridgeline Village — NewmanGreat Northern Hwy, Newman WA 6753
- Unit
- BP20-0003
- Technician
- Kade Morrison
- Scheduled
- 09 Oct 2026 · 07:00 · 3 h
- Charging
- Covered by lease
Site access: Report to village reception. Escort required past the wet mess.
Sign-off
Waiting for the technician — 9 of 19 checks done. The customer signs on the technician's phone.