Blackout Performance

SJ-26-0499

Quarterly service — BP20-0005 (Mt Turner Camp) — Red Earth Resources
Demo 09 Oct 2026
← Service jobs Schedule
Open in technician app
To scheduleScheduledIn progressCompleteInvoiced Scheduled service
Checklist0 / 19
Sauna
Heater elements tested — resistance within spec
Stones inspected, re-stacked, crumbled stones replaced
Controller & temperature sensor tested
Sauna temperature reached— °C
Time to temperature— min
Benches cleaned, sanded where needed and oiled
Door glass, hinges and seal inspected
Vent valve operating
Ice room
Ice room temperature reached— °C
Condensing unit coils cleaned
Evaporator fan & condensate drain checked
Door gasket & heater strip checked
Return-air filter replaced
Electrical & safety
RCD trip test— ms
Isolator, inlet and leads inspected
Lighting & emergency stop working
Safe-use signage present & legible
Exterior
Container, deck & steps inspected
Before & after photos taken
Photos
No photos yet.
Partsallocated now, issued from stock on sign-off
PartQty
OIL-BNCH — Bench oil / paraffin finish 1 L 1 btl Allocated
CLN-SAN — Sauna cleaner / sanitiser 5 L 1 ea Allocated
FLT-AIR — Ice room return-air filter 1 ea Allocated
Timesheet0 h
DateWhoTypeHoursNote
Nothing here yet — use “Log time” to create the first one.
Customer
Red Earth Resources
Site
Mt Turner Camp — Paraburdoo
Mt Turner Access Road, Paraburdoo WA 6754
Unit
BP20-0005
Technician
Kade Morrison
Scheduled
14 Oct 2026 · 07:00 · 3 h
Charging
Covered by lease
Site access: Fly in via Paraburdoo (PBO). Camp bus from airport.
Sign-off
Waiting for the technician — 0 of 19 checks done. The customer signs on the technician's phone.