Blackout Performance

SJ-26-0494

Quarterly service — BP10-0008 (Stirling Leisure Balga) — City of Stirling
Demo 09 Oct 2026
← Service jobs Schedule
Open in technician app
To scheduleScheduledIn progressCompleteInvoiced Scheduled service
Checklist0 / 14
Sauna
Heater elements tested — resistance within spec
Stones inspected, re-stacked, crumbled stones replaced
Controller & temperature sensor tested
Sauna temperature reached— °C
Time to temperature— min
Benches cleaned, sanded where needed and oiled
Door glass, hinges and seal inspected
Vent valve operating
Electrical & safety
RCD trip test— ms
Isolator, inlet and leads inspected
Lighting & emergency stop working
Safe-use signage present & legible
Exterior
Container, deck & steps inspected
Before & after photos taken
Photos
No photos yet.
Partsallocated now, issued from stock on sign-off
PartQty
OIL-BNCH — Bench oil / paraffin finish 1 L 1 btl Allocated
CLN-SAN — Sauna cleaner / sanitiser 5 L 1 ea Allocated
Timesheet0 h
DateWhoTypeHoursNote
Nothing here yet — use “Log time” to create the first one.
Customer
City of Stirling
Site
Stirling Leisure Balga
Princess Road, Balga WA 6061
Unit
BP10-0008
Technician
Liam Hartley
Scheduled
09 Oct 2026 · 06:00 · 2 h
Charging
$960 ex GST
Site access: Unit sits beside the outdoor pool concourse. Service before 6 am or after 8 pm, or close the zone.
Before pool opens — Mark Delaney meeting Liam at the concourse gate 5:45 am.
Sign-off
Waiting for the technician — 0 of 14 checks done. The customer signs on the technician's phone.