Quarterly service — BP20-0013 — Perth Rugby Academy
Demo 09 Oct 2026
To scheduleScheduledIn progressCompleteInvoiced Scheduled service
Checklist19 / 19
Sauna
✓Heater elements tested — resistance within spec
✓Stones inspected, re-stacked, crumbled stones replaced
✓Controller & temperature sensor tested
✓Sauna temperature reached87 °C
✓Time to temperature29 min
✓Benches cleaned, sanded where needed and oiled
✓Door glass, hinges and seal inspected
✓Vent valve operating
Ice room
✓Ice room temperature reached-10 °C
✓Condensing unit coils cleaned
✓Evaporator fan & condensate drain checked
✓Door gasket & heater strip checked
✓Return-air filter replaced
Electrical & safety
✓RCD trip test19 ms
✓Isolator, inlet and leads inspected
✓Lighting & emergency stop working
✓Safe-use signage present & legible
Exterior
✓Container, deck & steps inspected
✓Before & after photos taken
Photos
After service — benches oiled
After service — benches oiled
Partsallocated now, issued from stock on sign-off
PartQty
OIL-BNCH — Bench oil / paraffin finish 1 L 1 btl Issued
CLN-SAN — Sauna cleaner / sanitiser 5 L 1 ea Issued
FLT-AIR — Ice room return-air filter 1 ea Issued
Timesheet3 h
DateWhoTypeHoursNote
14 Sep 2026 Liam Hartley On site 3 —
Customer
Perth Rugby Academy
Site
High Performance Centre
Stephenson Avenue, Mount Claremont WA 6010
Unit
BP20-0013
Technician
Liam Hartley
Scheduled
14 Sep 2026 · 10:00 · 3 h
Charging
Covered by lease
Site access: Gate code from Callum.
Sign-off
Completed 14 Sep 2026 · 11:15 · signed by Callum Reid
Findings: Heater to 88 °C in 34 min. Signage replaced (sun-faded).
✓ 3 part line(s) issued from stock ✓ BP20-0013 next service 14 Dec 2026 ✓ Covered by lease — no charge