To scheduleScheduledIn progressCompleteInvoiced Scheduled service
Checklist19 / 19
Sauna
✓Heater elements tested — resistance within spec
✓Stones inspected, re-stacked, crumbled stones replaced
✓Controller & temperature sensor tested
✓Sauna temperature reached88 °C
✓Time to temperature31 min
✓Benches cleaned, sanded where needed and oiled
✓Door glass, hinges and seal inspected
✓Vent valve operating
Ice room
✓Ice room temperature reached-10 °C
✓Condensing unit coils cleaned
✓Evaporator fan & condensate drain checked
✓Door gasket & heater strip checked
✓Return-air filter replaced
Electrical & safety
✓RCD trip test18 ms
✓Isolator, inlet and leads inspected
✓Lighting & emergency stop working
✓Safe-use signage present & legible
Exterior
✓Container, deck & steps inspected
✓Before & after photos taken
Photos

Partsallocated now, issued from stock on sign-off
| Part | Qty | |||
|---|---|---|---|---|
| OIL-BNCH — Bench oil / paraffin finish 1 L | 1 | btl | Issued | |
| CLN-SAN — Sauna cleaner / sanitiser 5 L | 1 | ea | Issued | |
| FLT-AIR — Ice room return-air filter | 1 | ea | Issued | |
Timesheet4.5 h
| Date | Who | Type | Hours | Note | |
|---|---|---|---|---|---|
| 03 Jul 2026 | Kade Morrison | Travel | 1.5 | Camp → site | |
| 03 Jul 2026 | Kade Morrison | On site | 3 | — | |
- Customer
- City of Karratha
- Site
- Karratha LeisureplexDampier Highway, Karratha WA 6714
- Unit
- BP20-0011
- Technician
- Kade Morrison
- Scheduled
- 03 Jul 2026 · 13:00 · 3 h
- Charging
- Covered by lease
Site access: Report to front desk.
Sign-off
Completed 03 Jul 2026 · 11:15 · signed by Jodie Palmer
✓ 3 part line(s) issued from stock ✓ BP20-0011 next service 01 Jan 2027 ✓ Covered by lease — no charge