To scheduleScheduledIn progressCompleteInvoiced Scheduled service
Checklist19 / 19
Sauna
✓Heater elements tested — resistance within spec
✓Stones inspected, re-stacked, crumbled stones replaced
✓Controller & temperature sensor tested
✓Sauna temperature reached89 °C
✓Time to temperature38 min
✓Benches cleaned, sanded where needed and oiled
✓Door glass, hinges and seal inspected
✓Vent valve operating
Ice room
✓Ice room temperature reached-11 °C
✓Condensing unit coils cleaned
✓Evaporator fan & condensate drain checked
✓Door gasket & heater strip checked
✓Return-air filter replaced
Electrical & safety
✓RCD trip test21 ms
✓Isolator, inlet and leads inspected
✓Lighting & emergency stop working
✓Safe-use signage present & legible
Exterior
✓Container, deck & steps inspected
✓Before & after photos taken
Photos

Partsallocated now, issued from stock on sign-off
| Part | Qty | |||
|---|---|---|---|---|
| OIL-BNCH — Bench oil / paraffin finish 1 L | 1 | btl | Issued | |
| CLN-SAN — Sauna cleaner / sanitiser 5 L | 1 | ea | Issued | |
| FLT-AIR — Ice room return-air filter | 1 | ea | Issued | |
Timesheet9.5 h
| Date | Who | Type | Hours | Note | |
|---|---|---|---|---|---|
| 07 Apr 2026 | Goldfields Electrical Services | Travel | 6.5 | — | |
| 07 Apr 2026 | Goldfields Electrical Services | On site | 3 | — | |
- Customer
- Westline Civil Contractors
- Site
- Kalgoorlie Workers VillageGreat Eastern Hwy, Kalgoorlie WA 6430
- Unit
- BP20-0009
- Technician
- Goldfields Electrical Services
- Scheduled
- 07 Apr 2026 · 10:00 · 3 h
- Charging
- Covered by lease
Site access: Reception 24 h.
Sign-off
Completed 07 Apr 2026 · 14:20 · signed by Brendan Shaw
✓ 3 part line(s) issued from stock ✓ BP20-0009 next service 03 Oct 2026 ✓ Covered by lease — no charge