Blackout Performance

SJ-26-0478

Quarterly service — BP20-0008 — Red Earth Resources
Demo 09 Oct 2026
To scheduleScheduledIn progressCompleteInvoiced Scheduled service
Checklist14 / 14
Sauna
✓Heater elements tested — resistance within spec
✓Stones inspected, re-stacked, crumbled stones replaced
✓Controller & temperature sensor tested
✓Sauna temperature reached86 °C
✓Time to temperature42 min
✓Benches cleaned, sanded where needed and oiled
✓Door glass, hinges and seal inspected
✓Vent valve operating
Electrical & safety
✓RCD trip test19 ms
✓Isolator, inlet and leads inspected
✓Lighting & emergency stop working
✓Safe-use signage present & legible
Exterior
✓Container, deck & steps inspected
✓Before & after photos taken
Photos
No photos yet.
Partsallocated now, issued from stock on sign-off
PartQty
OIL-BNCH — Bench oil / paraffin finish 1 L 1 btl Issued
CLN-SAN — Sauna cleaner / sanitiser 5 L 1 ea Issued
Timesheet3.5 h
DateWhoTypeHoursNote
16 Sep 2026 Kade Morrison Travel 1.5 Camp → site
16 Sep 2026 Kade Morrison On site 2 —
Customer
Red Earth Resources
Site
Mt Turner Camp — Paraburdoo
Mt Turner Access Road, Paraburdoo WA 6754
Unit
BP20-0008
Technician
Kade Morrison
Scheduled
16 Sep 2026 · 07:00 · 2 h
Charging
Covered by lease
Site access: Fly in via Paraburdoo (PBO). Camp bus from airport.
Sign-off
Completed 16 Sep 2026 · 14:20 · signed by Sharna Whitlock
Findings: Minor timber checking on top bench — sanded and oiled.
✓ 2 part line(s) issued from stock ✓ BP20-0008 next service 16 Dec 2026 ✓ Covered by lease — no charge