Blackout Performance

SJ-26-0466

Quarterly service — BP10-0009 — Pilbara Port Services
Demo 09 Oct 2026
To scheduleScheduledIn progressCompleteInvoiced Scheduled service
Checklist14 / 14
Sauna
✓Heater elements tested — resistance within spec
✓Stones inspected, re-stacked, crumbled stones replaced
✓Controller & temperature sensor tested
✓Sauna temperature reached90 °C
✓Time to temperature38 min
✓Benches cleaned, sanded where needed and oiled
✓Door glass, hinges and seal inspected
✓Vent valve operating
Electrical & safety
✓RCD trip test23 ms
✓Isolator, inlet and leads inspected
✓Lighting & emergency stop working
✓Safe-use signage present & legible
Exterior
✓Container, deck & steps inspected
✓Before & after photos taken
Photos
After service — benches oiled
After service — benches oiled
Partsallocated now, issued from stock on sign-off
PartQty
OIL-BNCH — Bench oil / paraffin finish 1 L 1 btl Issued
CLN-SAN — Sauna cleaner / sanitiser 5 L 1 ea Issued
Timesheet3.5 h
DateWhoTypeHoursNote
30 Apr 2026 Kade Morrison Travel 1.5 Camp → site
30 Apr 2026 Kade Morrison On site 2 —
Customer
Pilbara Port Services
Site
Port Hedland Crew Village
Hamilton Road, South Hedland WA 6722
Unit
BP10-0009
Technician
Kade Morrison
Scheduled
30 Apr 2026 · 13:00 · 2 h
Charging
Covered by lease
Site access: Port security card or escort.
Sign-off
Completed 30 Apr 2026 · 15:05 · signed by Marcus Lee
✓ 2 part line(s) issued from stock ✓ BP10-0009 next service 29 Oct 2026 ✓ Covered by lease — no charge