Blackout Performance

SJ-26-0463

Quarterly service — BP20-0006 — Ironbark Mining Services
Demo 09 Oct 2026
To scheduleScheduledIn progressCompleteInvoiced Scheduled service
Checklist19 / 19
Sauna
✓Heater elements tested — resistance within spec
✓Stones inspected, re-stacked, crumbled stones replaced
✓Controller & temperature sensor tested
✓Sauna temperature reached87 °C
✓Time to temperature30 min
✓Benches cleaned, sanded where needed and oiled
✓Door glass, hinges and seal inspected
✓Vent valve operating
Ice room
✓Ice room temperature reached-9 °C
✓Condensing unit coils cleaned
✓Evaporator fan & condensate drain checked
✓Door gasket & heater strip checked
✓Return-air filter replaced
Electrical & safety
✓RCD trip test15 ms
✓Isolator, inlet and leads inspected
✓Lighting & emergency stop working
✓Safe-use signage present & legible
Exterior
✓Container, deck & steps inspected
✓Before & after photos taken
Photos
After service — benches oiled
After service — benches oiled
Partsallocated now, issued from stock on sign-off
PartQty
OIL-BNCH — Bench oil / paraffin finish 1 L 1 btl Issued
CLN-SAN — Sauna cleaner / sanitiser 5 L 1 ea Issued
FLT-AIR — Ice room return-air filter 1 ea Issued
Timesheet4.5 h
DateWhoTypeHoursNote
25 Aug 2026 Kade Morrison Travel 1.5 Camp → site
25 Aug 2026 Kade Morrison On site 3 —
Customer
Ironbark Mining Services
Site
Kurra Camp — Tom Price
Kurra Village Road, Tom Price WA 6751
Unit
BP20-0006
Technician
Kade Morrison
Scheduled
25 Aug 2026 · 10:00 · 3 h
Charging
Covered by lease
Site access: Site induction (Ironbark online module) before first visit. Light vehicle permit.
Sign-off
Completed 25 Aug 2026 · 14:20 · signed by Dean Kowalski
✓ 3 part line(s) issued from stock ✓ BP20-0006 next service 24 Nov 2026 ✓ Covered by lease — no charge