To scheduleScheduledIn progressCompleteInvoiced Scheduled service
Checklist14 / 14
Sauna
✓Heater elements tested — resistance within spec
✓Stones inspected, re-stacked, crumbled stones replaced
✓Controller & temperature sensor tested
✓Sauna temperature reached91 °C
✓Time to temperature35 min
✓Benches cleaned, sanded where needed and oiled
✓Door glass, hinges and seal inspected
✓Vent valve operating
Electrical & safety
✓RCD trip test15 ms
✓Isolator, inlet and leads inspected
✓Lighting & emergency stop working
✓Safe-use signage present & legible
Exterior
✓Container, deck & steps inspected
✓Before & after photos taken
Photos

Partsallocated now, issued from stock on sign-off
| Part | Qty | |||
|---|---|---|---|---|
| OIL-BNCH — Bench oil / paraffin finish 1 L | 1 | btl | Issued | |
| CLN-SAN — Sauna cleaner / sanitiser 5 L | 1 | ea | Issued | |
Timesheet3.5 h
| Date | Who | Type | Hours | Note | |
|---|---|---|---|---|---|
| 04 Sep 2026 | Kade Morrison | Travel | 1.5 | Camp → site | |
| 04 Sep 2026 | Kade Morrison | On site | 2 | — | |
- Customer
- Ironbark Mining Services
- Site
- Ridgeline Village — NewmanGreat Northern Hwy, Newman WA 6753
- Unit
- BP10-0005
- Technician
- Kade Morrison
- Scheduled
- 04 Sep 2026 · 08:30 · 2 h
- Charging
- Covered by lease
Site access: Report to village reception. Escort required past the wet mess.
Sign-off
Completed 04 Sep 2026 · 14:20 · signed by Dean Kowalski
Findings: Heater to 88 °C in 34 min. Signage replaced (sun-faded).
✓ 2 part line(s) issued from stock ✓ BP10-0005 next service 01 Dec 2026 ✓ Covered by lease — no charge