To scheduleScheduledIn progressCompleteInvoiced Scheduled service
Checklist19 / 19
Sauna
✓Heater elements tested — resistance within spec
✓Stones inspected, re-stacked, crumbled stones replaced
✓Controller & temperature sensor tested
✓Sauna temperature reached90 °C
✓Time to temperature38 min
✓Benches cleaned, sanded where needed and oiled
✓Door glass, hinges and seal inspected
✓Vent valve operating
Ice room
✓Ice room temperature reached-9 °C
✓Condensing unit coils cleaned
✓Evaporator fan & condensate drain checked
✓Door gasket & heater strip checked
✓Return-air filter replaced
Electrical & safety
✓RCD trip test21 ms
✓Isolator, inlet and leads inspected
✓Lighting & emergency stop working
✓Safe-use signage present & legible
Exterior
✓Container, deck & steps inspected
✓Before & after photos taken
Photos
No photos yet.
Partsallocated now, issued from stock on sign-off
| Part | Qty | |||
|---|---|---|---|---|
| OIL-BNCH — Bench oil / paraffin finish 1 L | 1 | btl | Issued | |
| CLN-SAN — Sauna cleaner / sanitiser 5 L | 1 | ea | Issued | |
| FLT-AIR — Ice room return-air filter | 1 | ea | Issued | |
Timesheet4.5 h
| Date | Who | Type | Hours | Note | |
|---|---|---|---|---|---|
| 09 Sep 2026 | Kade Morrison | Travel | 1.5 | Camp → site | |
| 09 Sep 2026 | Kade Morrison | On site | 3 | — | |
- Customer
- Ironbark Mining Services
- Site
- Kurra Camp — Tom PriceKurra Village Road, Tom Price WA 6751
- Unit
- BP20-0002
- Technician
- Kade Morrison
- Scheduled
- 09 Sep 2026 · 13:00 · 3 h
- Charging
- $5,183 ex GST
Site access: Site induction (Ironbark online module) before first visit. Light vehicle permit.
Sign-off
Completed 09 Sep 2026 · 15:05 · signed by Dean Kowalski
Findings: Ice room to −11 °C. Filter changed, coils cleaned.
✓ 3 part line(s) issued from stock ✓ BP20-0002 next service 10 Dec 2026 ✓ Invoice INV-2180 · $5,701 inc GST · Sent